Speed to power — solar farms

For solar farms the opwek (feed-in) grade is the binding constraint. Filter on A/B opwek; areas with a poor afname grade often have plenty of opwek room (and vice versa). Use the time scrubber to see when grades flip.

How to read

  1. Switch to opwek (feed-in) in the Direction toggle at the top of the map.
  2. Filter on A/B in the Lens — anything above is connectable without waiting.
  3. Open a feeder area. The detail panel shows the TenneT cap, relief year and the planned reinforcement projects.
  4. Use the timeline scrubber to project grades forward to your permitting window.

Example regions

For the full list of regions, see coverage. For the methodology: methodology; for the citable headline numbers: numbers.