Dutch grid congestion — four citable numbers

A citation-ready snapshot of the Dutch electricity grid. Every figure comes from the latest national snapshot (2026-05-21).

Queued consumption (afname)
7.4 GW
Requested MW that DSOs cannot yet allocate on the consumption side.
Queued feed-in (opwek)
5.4 GW
Requested MW for grid export — solar farms, batteries in export mode, wind.
MW unlocked at TenneT relief
21.3 GW
Total MW in areas where TenneT has published a relief year; cap drops on that year.
Municipalities without an F grade
202 / 343 (59%)
Share of Dutch municipalities currently free of an F (lock-out) grade on either direction.

How to cite

Suggested wording, snapshot date inline:

"As of 2026-05-21, the Dutch grid has 7.4 GW in the consumption queue and 5.4 GW in the feed-in queue. Source: Dutch Grid, based on Netbeheer Nederland / TenneT disclosures."