Speed to power — grid batteries

For a hybrid BESS, both grades matter. The most lucrative siting is in areas with a D/E on one direction and an A/B on the other — that spread is where congestion-management revenue is largest.

How to read

  1. Switch to afname (consumption) in the Direction toggle at the top of the map.
  2. Filter on A/B in the Lens — anything above is connectable without waiting.
  3. Open a feeder area. The detail panel shows the TenneT cap, relief year and the planned reinforcement projects.
  4. Use the timeline scrubber to project grades forward to your permitting window.

Example regions

For the full list of regions, see coverage. For the methodology: methodology; for the citable headline numbers: numbers.